ENERGY SHIELD — I&C ENGINEERING & COMMISSIONING Email: info@energyshieldco.com | Phone: +201007211581 ------------------------------------------------------------------ Title: Sample Control Narrative — Feed Water System Stage: Engineering Phase 3 (Detailed Design) Summary: Covers purpose, operating modes (Auto / Manual / Local), start permissives, trips and interlocks (including auto-standby changeover), control loops, and alarms. Note: Connect an R2 bucket binding (DOCS_BUCKET) in worker.js to serve full PDF/XLSX files.